PROJECTS
Shower Replacement & Tiling
This project involved a full shower replacement combined with new wall tiling to modernise the space and improve functionality.
We carefully removed the existing shower unit and tiles, exposing the pipework to assess and upgrade connections where required.
All plumbing was adjusted and secured to ensure correct alignment for the new shower system before any finishes were installed.
Once the services were tested and confirmed leak-free, we prepared the walls and installed new tiles with precise spacing and clean lines for a polished finish.
Our process included:
Safe removal of the old shower unit and existing tiles
Inspection and adjustment of concealed pipework
Installation of the new shower system with accurate positioning
Surface preparation and professional tiling for a smooth, durable finish
Final testing, sealing, and clean up to ensure long-term reliability
The result is a modern, fully functional shower area with a clean finish, improved water flow, and high-quality workmanship throughout.